Liquid-Cooling 250 kW Load Bank – for commissioning process
Simulate server heat loads and verify the temperature, pressure and flow rate of your liquid cooling system before live IT equipment is connected.
250 kW
per unit (rack-mount and In-Row)
Rack → POD
from one controller
Auto-stop
on dry running or overheating
Commissioning
We don't just deliver load banks. We streamline your commissioning.
Full-load liquid-cooling validation is new to most teams. We help you eliminate manual headaches and streamline your commissioning process, from test plan to final report.
4 validation functions for real-world operating conditions
2 configurations to suit your validation environment
Typical use cases
| Commissioning | Integrated system test before handover |
|---|---|
| Acceptance | CDU and secondary-loop performance |
| Expansion | New halls or retrofits, live site |
| Troubleshooting | Re-test after changes or incidents |
What it validates
- Dry cooler / chiller
- CDU
- Secondary piping
- Load bank in place of servers
Just need the flyer? Download it here, no sign-up.
Download the flyer

Ask about the load bank
Tell us about your site and timing – we will come back with a proposal.
Developed & engineered by KANNETSU · Sales & enquiries: DAIICHI JITSUGYO / DJK Europe